Courtesy Loaner Special!!! 2025 F-150 XLT 4WD Super Crew***Equipment Group 302A ($7,440)***Mobile Office Package ($555)***SYNC4 w/ 12-inch Touch Screen Display***Apple CarPlay & Android Auto***Connected Navigation***Ford Co-Pilot360 Assist 2.0***FordPass Connect***Bluetooth***USB A and C Ports***Wireless Charging Pad***12V Power Points***400W Cab & Bed Outlets***Intelligent Access w/ Push-Button Start***Remote Start System w/ Remote Tailgate Release***Perimeter Alarm***BLIS w/ Cross-Traffic Alert***Lane-Keeping System***Post-Collision Braking***Pre-Collision Assist***Reverse Brake Assist***Reverse Sensing and Rear-View Camera***360-Degree Camera***Adaptive Cruise Control w/ Stop & Go***Driver State Detection***Evasive Steering Assist***Front Parking Sensors***Towing Technology***12-inch Productivity Screen***Selectable Driver Modes***Illuminated Entry***Auto-Dimming Rear-View Mirror***Dual-Zone Auto Climate Control***Cloth 40/Console/40 Power & Heated Front Seats***Console Worksurface***Partitioned Lockable Rear Storage***Tilt/Telescopic Wrapped Steering Wheel w/ Audio & Cruise Controls***Daytime Running Lamps***Fully Automatic LED Reflector Headlamps***Auto High Beams***Fog Lamps***Power Heated Side-View Mirrors***LED Side Mirror Spotlights***Power-Sliding Rear Window***Pickup Box Tie-Down Hooks***Power Tailgate Lock***Rear Privacy Glass***Trailer Sway Control***Class IV Trailer Hitch w/ Smart Trailer Tow Connector***Zone Lighting***6-inch Angular Bright Anodized Step Bars***Black Painted Grille w/ Chrome Center Bar***Chrome Door & Tailgate Handles***Chrome Single-Tip Exhaust***Electronic Locking w/ 3.73 Axle Ratio***18-inch Chrome-Like PVD Wheels***3.5L PowerBoost Full-Hybrid V6 Engine ($3,560)***Hybrid Electronic 10-Speed Automatic Transmission***Iconic Silver Metallic Paint*** There truly is a difference when buying a New Vehicle at Sarchione Ford. You are able to work with one person from start to finish as there is no need for back and forth negotiations. At Sarchione Ford you will experience the most hassle free New Vehicle buying experience around. We have over 300 New Vehicles in stock. Come experience the Sarchione buying experience and ''Let our Family Serve your Family'' Price includes applicable rebates and excludes tax, title, license documentation fees ($250); $1000 - Bonus Customer Cash. Exp. 03/31/2026 $1000 - Truck Month Retail Bonus Cash. Exp. 03/31/2026 $2000 - Retail Customer Cash. Exp. 03/31/2026
VIN
1FTFW3LDXSFA16215
NHTSA VerifiedStock #
ridemotive-781517
Dealer
Sarchione Ford of Randolph
Get notified about trucks like this
We'll email you when similar listings are added or prices drop.