Thank you for choosing Legacy Ford , this Star White Metallic Tri-Coat 2025 Ford F-150 Platinum is a great choice! Check out the following: What this vehicles includes: FX4 Off-Road Package ($1,095 value) Skid Plates Tray Style Floor Liner with Carpet Mats 4x4 FX4 Off-Road Bodyside Decal Hill Descent Control Off-Road Tuned Front Shock Absorbers Monotube Rear Shocks Rock Crawl Mode Equipment Group 702A High ($6,540 value) Twin Panel Moonroof Electronic 10-Speed Automatic Transmission 20" Painted Gloss Ebony Black Wheels Unique Multi-Contour Leather Bucket Seats 3.5L V6 EcoBoost Engine Heads-Up Display B&O Unleashed Sound System by Bang & Olufsen Radio 7,100 lbs Payload Package GVWR 275/60R20 BSW A/T Tires Electronic Locking with 3.55 Axle Ratio Convenience The cruise control accesses camera, radar and/or GPS satellite data, to automatically determine if it should slow for a curve in the road ahead. If the vehicle detects prolonged driver unresponsiveness it will automatically bring the vehicle to a stop and turn on the hazard lights. If equipped, emergency services will be contacted. Safety and Security A system of this type allows the driver to travel for extended periods of time without providing steering input to the vehicle, however they must be ready to resume control of the vehicle at any point. With the cruise control on, engage the turn-signal and the vehicle will automatically change lanes at the first safe opportunity, without any further input from the driver. The vehicle constantly monitors the roadway in front of the vehicle and identifies and tracks pedestrians on an interior display. If the system determines a likely impact, it will automatically take preventative steps to avoid hitting the pedestrian. Technology and Telematics SYNC 4 AppLink/Apple CarPlay/Android Auto smart device wireless mirroring About us: At the Legacy Automotive Network family of dealerships our goal is to provide every customer with an exceptional experience from start to finish. We pride ourselves on being friendly, professional, and helpful without pressure, taking the time to listen, answer questions, and communicate clearly every step of the way. Whether you're working with our sales or service team, customer satisfaction is always our top priority, and we strive to handle every interaction efficiently and with care. We truly appreciate the trust our customers place in us and look forward to continuing to serve the Corbin community with honesty, respect, and dedication. Retail Customer Cash (#11664). Eligible buyers may receive Retail Customer Cash on select new vehicles. Incentive may not be combined with Ford Credit Lease or Special APR financing. Take new retail delivery from dealer stock by 03/31/2026. Residency restrictions apply. See dealer for qualifications and complete details. ($2000) Expires: 04/01/2026 Come on in to Legacy Ford today at 13305 North HWY 25E Corbin KY 40701 or to schedule a test drive!
VIN
1FTFW7L87SFA56116
NHTSA VerifiedStock #
ridemotive-2364855
Dealer
Leith Ford
Get notified about trucks like this
We'll email you when similar listings are added or prices drop.